ePapers Repository

Blind and mount controller repairs in Las Campanas in 2014 June

Hale, Steven J. (2014) Blind and mount controller repairs in Las Campanas in 2014 June. Technical Report. Birmingham Solar Oscillations Network.

[img]
Preview
PDF (LaTeX) - Published Version
bison366.pdf
158Kb

Abstract

The blind open/close limit-switch, and the shutter-down limit-switch were both re-placed. The mount controller motor current-limits were increased. The water-cooling pump and motor were restored.

Type of Work:Monograph (Technical Report)
School/Faculty:Colleges (2008 onwards) > College of Engineering & Physical Sciences
Number of Pages:7
Department:High-Resolution Optical Spectroscopy
Additional Information:

Minor editorial revisions November 2015

Date:15 July 2014
Projects:BiSON - Birmingham Solar Oscillations Network
Series/Collection Name:BiSON Technical Report Series
Keywords:Helioseismology, Observations; Oscillations, Solar
Subjects:Q Science > QB Astronomy
Q Science > QC Physics
Related URLs:
URLURL Type
http://bison.ph.bham.ac.ukPublisher
ID Code:2061

Export Reference As : ASCII + BibTeX + Dublin Core + EndNote + HTML + METS + MODS + OpenURL Object + Reference Manager + Refer + RefWorks
Share this item :
QR Code for this page

Repository Staff Only: item control page