Hale, Steven J. (2014) Blind and mount controller repairs in Las Campanas in 2014 June. Technical Report. Birmingham Solar Oscillations Network.
| PDF (LaTeX) - Published Version bison366.pdf 158Kb |
Abstract
The blind open/close limit-switch, and the shutter-down limit-switch were both re-placed. The mount controller motor current-limits were increased. The water-cooling pump and motor were restored.
Type of Work: | Monograph (Technical Report) | ||||
---|---|---|---|---|---|
School/Faculty: | Colleges (2008 onwards) > College of Engineering & Physical Sciences | ||||
Number of Pages: | 7 | ||||
Department: | High-Resolution Optical Spectroscopy | ||||
Additional Information: | Minor editorial revisions November 2015 | ||||
Date: | 15 July 2014 | ||||
Projects: | BiSON - Birmingham Solar Oscillations Network | ||||
Series/Collection Name: | BiSON Technical Report Series | ||||
Keywords: | Helioseismology, Observations; Oscillations, Solar | ||||
Subjects: | Q Science > QB Astronomy Q Science > QC Physics | ||||
Related URLs: |
| ||||
ID Code: | 2061 |
|
Repository Staff Only: item control page