A check on Carnarvon in 2014 November following NBN construction

Hale, Steven J. (2014) A check on Carnarvon in 2014 November following NBN construction. Technical Report. Birmingham Solar Oscillations Network.

[img]
Preview
PDF (LaTeX) - Published Version
bison367.pdf
156Kb

Abstract

The site was checked for damage following the adjacent NBN construction. Everything was cleaned and tidied. The forward detector Peltiers were replaced. The water tank was refilled and the cooling-loop repaired.

Type of Work:Monograph (Technical Report)
School/Faculty:Colleges (2008 onwards) > College of Engineering & Physical Sciences
Number of Pages:6
Department:High-Resolution Optical Spectroscopy
Date:05 December 2014
Projects:BiSON - Birmingham Solar Oscillations Network
Series/Collection Name:BiSON Technical Report Series
Keywords:Helioseismology, Observations; Oscillations, Solar
Subjects:Q Science > QB Astronomy
Q Science > QC Physics
Related URLs:
URLURL Type
http://bison.ph.bham.ac.ukPublisher
ID Code:2062

Export Reference As : ASCII + BibTeX + Dublin Core + EndNote + HTML + METS + MODS + OpenURL Object + Reference Manager + Refer + RefWorks
Share this item :
QR Code for this page

Repository Staff Only: item control page