ePapers Repository

Temperature control repairs in Narrabri in 2015 October

Hale, Steven J. (2015) Temperature control repairs in Narrabri in 2015 October. Technical Report. Birmingham Solar Oscillations Network.

[img]
Preview
PDF
bison375.pdf
134Kb

Abstract

The temperature drive cable was replaced, a new water-loop motor and pump was installed, and an air conditioner was replaced. The current-limit on the mount motors was increased, and the mount gears cleaned and re-lubricated.

Type of Work:Monograph (Technical Report)
School/Faculty:Colleges (2008 onwards) > College of Engineering & Physical Sciences
Number of Pages:5
Department:High-Resolution Optical Spectroscopy
Date:04 December 2015
Projects:BiSON - Birmingham Solar Oscillations Network
Series/Collection Name:BiSON Technical Report Series
Keywords:Helioseismology, Observations; Oscillations, Solar
Subjects:Q Science > QB Astronomy
Q Science > QC Physics
Related URLs:
URLURL Type
http://bison.ph.bham.ac.ukPublisher
ID Code:2084

Export Reference As : ASCII + BibTeX + Dublin Core + EndNote + HTML + METS + MODS + OpenURL Object + Reference Manager + Refer + RefWorks
Share this item :
QR Code for this page

Repository Staff Only: item control page