Hale, Steven J. (2018) Peltier repairs at Narrabri in 2018 February. Technical Report. Birmingham Solar Oscillations Network.
| PDF bison388.pdf 255Kb |
Abstract
The Peltier thermoelectric modules were replaced in the starboard scattering detector. The port detector modules were tested and confirmed operational. The water-coolant pump was found to have failed. A position encoder failed during the site visit, and temporary repairs were completed allowing normal operation. Replacements for both the pump and encoder will be sent from Birmingham.
Type of Work: | Monograph (Technical Report) | ||||||
---|---|---|---|---|---|---|---|
School/Faculty: | Colleges (2008 onwards) > College of Engineering & Physical Sciences | ||||||
Number of Pages: | 5 | ||||||
Department: | High-Resolution Optical Spectroscopy | ||||||
Date: | 19 February 2018 | ||||||
Projects: | BiSON - Birmingham Solar Oscillations Network | ||||||
Series/Collection Name: | BiSON Technical Report Series | ||||||
Keywords: | Helioseismology, Observations; Oscillations, Solar | ||||||
Subjects: | Q Science > QB Astronomy Q Science > QC Physics | ||||||
Related URLs: |
| ||||||
ID Code: | 3138 |
|
Repository Staff Only: item control page