Shutter repairs and updated fibre conversion at Carnarvon in 2019 February

Hale, Steven J. (2019) Shutter repairs and updated fibre conversion at Carnarvon in 2019 February. Technical Report. Birmingham Solar Oscillations Network.

[img]
Preview
PDF
bison393.pdf
1094Kb

Abstract

Carnarvon was offline due to a shutter motor failure, and a computer failure. The shutter motor and reduction gearbox was replaced with the spare from the on-site shipping container. A new computer was installed. Further work was completed on the Jabba fibre conversion to resolve some ongoing issues and return the instrument performance and data quality to expected levels.

Type of Work:Monograph (Technical Report)
School/Faculty:Colleges (2008 onwards) > College of Engineering & Physical Sciences
Number of Pages:11
Department:High-Resolution Optical Spectroscopy
Date:27 March 2019
Projects:BiSON - Birmingham Solar Oscillations Network
Series/Collection Name:BiSON Technical Report Series
Keywords:Helioseismology, Observations; Oscillations, Solar
Subjects:Q Science > QB Astronomy
Q Science > QC Physics
Related URLs:
URLURL Type
http://bison.ph.bham.ac.ukPublisher
http://www.birmingham.ac.uk/staff/profiles/physics/hale-steven.aspxAuthor