Group by: No Grouping | No Grouping Number of items: 76. A check on Carnarvon in 2014 November following NBN constructionThe site was checked for damage following the adjacent NBN construction. Everything was cleaned and tidied. The forward detector Peltiers were replaced. The water tank was refilled and the cooling-loop repaired. | Author : Hale, Steven J. Date : 05 December 2014 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| A summary of the Haleakala dataThe times for which we have Haleakala data are listed. | Author : Elsworth, Yvonne and Miller, Brek A. and Votruba, Alena Date : 10 August 2006 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| A visit to Las Campanas after the lightning strike that destroyed our step-down transformerA visit was made to Las Campanas in the wake of a major lightning strike. Our step down transformer was replaced and everything to carne back to life. Some problems with the clutch mechanism surfaced, but were dealt with. A new water-cooling system that included a 44-gallon oil drum was installed... [ more ] A visit was made to Las Campanas in the wake of a major lightning strike. Our step down transformer was replaced and everything to carne back to life. Some problems with the clutch mechanism surfaced, but were dealt with. A new water-cooling system that included a 44-gallon oil drum was installed. And finally, some changes were made to the temperature controllers. | Author : Lines, Richard Date : 27 February 1998 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| A visit to Las Campanas in 1998 JanuaryA trip to Las Campanas was made between 1998 January 21 and February 2. The dome-motor mounting plate was tightened, the software was upgraded, the water cooling loop was reconfigured, the temperature readout system was changed, a sun monitor was installed, a new UPS was installed, and the clutc... [ more ] A trip to Las Campanas was made between 1998 January 21 and February 2. The dome-motor mounting plate was tightened, the software was upgraded, the water cooling loop was reconfigured, the temperature readout system was changed, a sun monitor was installed, a new UPS was installed, and the clutch was modified. | Author : Miller, Brek A. Date : 02 April 1998 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Aft-oven removed from Klaus at Mount Wilson in 2015 December
The aft cell-oven, magnet, and detectors were removed from spectrometer-K (``Klaus'') and returned to Birmingham. The tower was shutdown over the winter and will reopen in spring 2016. | Author : Hale, Steven J. Date : 24 December 2015 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Alignment of Klaus in Mount Wilson | Author : Hale, Steven J. Date : 07 August 2007 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Alignment of Klaus in Mount WilsonThe Pockels cell was emptied and refilled, all optics cleaned and aligned, a failing hard disk drive replaced, and the GPS repaired. | Author : Hale, Steven J. Date : 01 August 2008 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Autoguider repairs at Mount Wilson in 2014 AprilThe autoguider was repaired, optics were cleaned, new counters were installed, and a new coelostat alignment technique suggested. The data are very much improved, but the repairs will not be complete until the primary mirror can be realuminized. | Author : Hale, Steven J. Date : 23 June 2014 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Autoguider repairs at Mount Wilson in 2016 AprilThe 60-foot tower services were restarted for the summer. The mechanical actuator for the east/west axis on the second flat had almost seized, and so this was disassembled and cleaned. Some diagnostic work was performed on the guider module which indicated a fault due to loose interface cards, parti... [ more ] The 60-foot tower services were restarted for the summer. The mechanical actuator for the east/west axis on the second flat had almost seized, and so this was disassembled and cleaned. Some diagnostic work was performed on the guider module which indicated a fault due to loose interface cards, particularly the guider level threshold cards for both axes. No attempt has yet been made to secure the cards and improve their reliability. | Author : Hale, Steven J. Date : 17 June 2016 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Autoguider repairs in Las Campanas in 2012 MarchThe guider was adjusted and the grease on the mount worm gears replaced. All limit switches were replaced and tested. A new network camera was installed. The loose foam insulation on the dome and on the instruments was repaired. | Author : Hale, Steven J. Date : 05 April 2012 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| BeebSub #56A and BeebSub #56B BBC Computer SubstitutesThe BBC Computer Substitutes in Izaña are described. | Author : Barnes, Ian and Jackson, Barry and Miller, Brek A. Date : 20 November 2003 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| BeebSub #56C -- an improved BBC computer substituteThe improved BBC Computer Substitute in Izaña is described. | Author : Barnes, Ian and Jackson, Barry and Miller, Brek A. Date : 03 November 2004 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| BiSON data-file formatsThe RAWDATA, DAT, CMP, SM1, DATA, IZDATA, BBC, and RES file formats are defined. | Author : Allison, John and Chaplin, William J. and Elsworth, Yvonne and Hale, Steven J. and Miller, Brek A. Date : 19 February 2003 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| BiSON data-file formatsThe RAWDATA, DAT, CMP, SMI, DATA, IZDATA, BBC, SUCIO, and RES file formats are defined. | Author : Allison, John and Chaplin, William J. and Elsworth, Yvonne and Hale, Steven J. and Miller, Brek A. Date : 20 November 2003 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| BiSON data-file formatsThe RAWDATA, DAT, CMP, SM1, DATA, IZDATA, BBC, SUCIO, and RES file formats are defined. | Author : Allison, John and Chaplin, William J. and Elsworth, Yvonne and Hale, Steven J. and Miller, Brek A. Date : 15 September 2004 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| BiSON pockels-cell listThe Birmingham Solar-Oscillations Network Group has owned, and destroyed, many Pockels cells over the years. | Author : Hale, Steven J. and Williams, Hugh K. and Miller, Brek A. Date : 02 November 2004 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| BiSON pockels-cell listThe Birmingham Solar-Oscillations Network Group has owned, and destroyed, many Pockels cells over the years. | Author : Hale, Steven J. and Williams, Hugh K. and Miller, Brek A. Date : 01 July 2008 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| BiSON pockels-cell listThe Birmingham Solar-Oscillations Network Group has owned, and destroyed, many Pockels cells over the years. | Author : Hale, Steven J. and Williams, Hugh K. and Miller, Brek A. Date : 29 January 2009 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| BiSON pockels-cell listThe Birmingham Solar-Oscillations Network Group has owned, and destroyed, many Pockels cells over the years. | Author : Hale, Steven J. and Miller, Brek A. and Williams, Hugh K. Date : 15 September 2009 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Blind and mount controller repairs in Las Campanas in 2014 JuneThe blind open/close limit-switch, and the shutter-down limit-switch were both re-placed. The mount controller motor current-limits were increased. The water-cooling pump and motor were restored. | Author : Hale, Steven J. Date : 15 July 2014 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Carnarvon health checkA brief look at the current condition of Mark V and Jabba in Carnarvon. | Author : Hale, Steven J. Date : 09 November 2006 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Carnarvon trip report -- July/August 2005The main aim of this trip was to get the station running again after the May floods by fitting a new rain detector and a new amplifier/V-F module for Mark V, and by trying out new detector modules in Jabba. A few other repair and maintenance tasks were also achieved. | Author : New, Roger and Hale, Steven J. Date : 25 January 2006 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Carnarvon trip report -- May 2005Details of the work undertaken during a trip to Carnarvon during May 2005 is presented. | Author : Barnes, Ian and Hale, Steven J. Date : 08 September 2005 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Fibre-feed tests at Izana in 2017 MayA new fibre-based spectrometer was commissioned from 2017 May 8 to May 26. The system was initially commissioned using the light feed from the secondary cœlostat on the lower-level platform in the main observing room of the solar pyramid building. Limited operational time was achieved in this phase ... [ more ] A new fibre-based spectrometer was commissioned from 2017 May 8 to May 26. The system was initially commissioned using the light feed from the secondary cœlostat on the lower-level platform in the main observing room of the solar pyramid building. Limited operational time was achieved in this phase due to bad weather. At the end of the site visit the whole system was moved into the apex of the pyramid sharing light from the primary cœlostat with the Mark-I spectrometer, and remains running in this configuration. Data from the spectrometer suffers from poor low- and high-frequency noise that are thought to be caused by the size of the solar image formed on the end of the fibre. The guiding performance of the Skywatcher mount was tested when operating via a Raspberry Pi single-board computer, and results are consistent with earlier tests at Mount Wilson. No issues are expected with the use of the low-power system. | Author : Hale, Steven J. Date : 29 September 2017 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Fibre-feed tests at Izana in 2017 SeptemberThe new fibre-based spectrometer was updated from 2017 September 1 to 11. The detector electronic noise and atmospheric scintillation noise were both measured. The scintillation noise was found to be approximately 105 times higher than the electronic noise, and so the system is dominated by atmosphe... [ more ] The new fibre-based spectrometer was updated from 2017 September 1 to 11. The detector electronic noise and atmospheric scintillation noise were both measured. The scintillation noise was found to be approximately 105 times higher than the electronic noise, and so the system is dominated by atmospheric noise. It is unlikely that the LCD-based system switching polarisation states at 5 Hz will be able to equal the performance of a typical Pockel’s-cell-based system switching at 100 Hz. An overall reduction in noise power by a factor of almost 5 times is required to match the performance of Fred in Sutherland. This difference is of the order difference in scintillation noise between 5 Hz switching and 100 Hz switching. Two fibre-feeds were trialled. A 30 mm focal length lens to replace the exiting 80 mm, and so focusing a smaller image of the Sun onto the end of the fibre, and a telescope arrangement coupling quasi-parallel light into the fibre. The shorter focal length lens resolves both the low- and high-frequency issues experienced since initial commissioning. The quasi-parallel telescope fibre-feed suffers some Doppler-imaging problems and also produces higher noise levels due to the lower light throughput. The primary cœlostat mirror was replaced, and resulted in an increase in counts for Mark-I by approximately 3%. The PMT HV-PSU was replaced, removing a temporary 2kV unit and reinstating the normal 3kV supply resulting in a further increase in counts for Mark-I by approximately 18%. | Author : Hale, Steven J. Date : 29 September 2017 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Fibre-feed tests at Mount Wilson in 2016 SeptemberA Skywatcher HEQ5-Pro motorised mount and Starlight Express Superstar CCD guide camera with OpenCV image processing were tested in use as a solar tracker. The best performance in RA and declination respectively was 0.00 ± 6.15 arcseconds and −1.32 ± 6.62 arcseconds. This compares favourably with dat... [ more ] A Skywatcher HEQ5-Pro motorised mount and Starlight Express Superstar CCD guide camera with OpenCV image processing were tested in use as a solar tracker. The best performance in RA and declination respectively was 0.00 ± 6.15 arcseconds and −1.32 ± 6.62 arcseconds. This compares favourably with data captured on the standard BiSON mount in Carnarvon where the RA precision was measured to be 0.158 ± 8.434 arcseconds and declination −0.066 ± 3.823 arcseconds. The spectrometer was temporarily modified to accept a fibre-feed from the new mount. A low-frequency "footprint" was present in the data residuals that was not resolved, but otherwise results were as expected and comparable to the standard network performance. Two WiFi access points were installed, providing coverage over the whole tower. | Author : Hale, Steven J. Date : 24 December 2016 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Hannibal vapour cell replaced at Las Campanas in 2018 OctoberThe toroidal transformer power supply in the weather module failed and was replaced. The transformer failure caused the supply fuse for the main electronics rack to blow, additionally removing power from all other modules including the thermocouple sensor amplifiers within the Hannibal spectrometer.... [ more ] The toroidal transformer power supply in the weather module failed and was replaced. The transformer failure caused the supply fuse for the main electronics rack to blow, additionally removing power from all other modules including the thermocouple sensor amplifiers within the Hannibal spectrometer. Whilst the sensors were without power, the vapour cell oven became overheated and caused damage to the vapour cell. The cell was replaced with the last available spare. The two UPS devices were tested and both found to require new batteries. | Author : Hale, Steven J. Date : 05 November 2018 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| How do you get to the zoo?Directions to the zoon are presented along with the answers to many other questions. | Author : Miller, Brek A. Date : 28 August 2002 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Jabba fibre conversion at Carnarvon in 2018 AprilJabba was offline due to an internal water leak destroying the main power and signal pass-through PCBs at the rear of the spectrometer. Repairs were completed, including new PCBs and cabling, to bring Jabba back online. The aft starboard Peltier-effect thermoelectric coolers were replaced. Mark-V an... [ more ] Jabba was offline due to an internal water leak destroying the main power and signal pass-through PCBs at the rear of the spectrometer. Repairs were completed, including new PCBs and cabling, to bring Jabba back online. The aft starboard Peltier-effect thermoelectric coolers were replaced. Mark-V and Jabba were removed from the mount. Mark-V has been moved into storage, and Jabba reinstalled in the electronics area at the rear of the dome fed by an optical fibre where it no longer requires water cooling. Additional repair work was completed to the mount RA drive transmission including replacing the stepper motor and gearbox, and also replacing the RA potentiometer encoder and signal cable. A new UPS was installed. Ongoing issues with the fibre conversion require further work. | Author : Hale, Steven J. and Ross, Eddie Date : 22 June 2018 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Jabba is returned to Carnarvon in 2009 JulyWe visited Carnarvon from July 1 to 17. We put Jabba back on the mount. We also upgraded the computer from Fedora Core 5 to Fedora 10. | Author : Barnes, Ian and Miller, Brek A. Date : 07 September 2009 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Klaus fibre conversion at Mount Wilson in 2018 JuneKlaus was converted to accept a fibre-optic input, and a Sky-Watcher Solarquest mount was installed to provide a dedicated light feed. The new feed bypasses all of the tower optics and electronics, and so has resolved all ongoing issues with these systems. | Author : Hale, Steven J. Date : 24 August 2018 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Mark I scaler systemDrawings of the Mark I scaler system in Iza:fia are presented. | Author : McLeod, Clive P. Date : 10 July 2002 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Mount controller repairs at Las Campanas in 2017 NovemberProblems with the mount encoder position values and the RA drive were investigated and found to be caused by corrosion around the encoder header connectors on the PCB, and general dirt brought in by the cooling fan. The mount controller and RA motor were replaced with spares from Birmingham, resolvi... [ more ] Problems with the mount encoder position values and the RA drive were investigated and found to be caused by corrosion around the encoder header connectors on the PCB, and general dirt brought in by the cooling fan. The mount controller and RA motor were replaced with spares from Birmingham, resolving all faults. The delta-B module was decommissioned. | Author : Hale, Steven J. Date : 22 December 2017 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| New computer in Mount WilsonThe PC in Mount Wilson had failed. A replacement was built in Birmingham and installed on this trip. A new UPS and mains controller were installed. The effect of the primary mirror position on beam alignment was investigated. | Author : Hale, Steven J. Date : 26 May 2009 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| New temperature controller for Hannibal in Las Campanas in 2015 AprilA new temperature controller for Hannibal was installed. The mount RA motor was replaced. Some general maintenance was done on the weather sensors. | Author : Hale, Steven J. Date : May 2015 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| PC replaced in Izana in 2012 OctoberDetails of the trip to Izana in 2012 October are presented. | Author : Hale, Steven J. Date : 21 November 2012 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| PD/VFC #2 -- a detector for the Izana transmission monitorThe PD/VFC #2, a detector for the Izaña transmission monitor, is described. | Author : Barnes, Ian and Hale, Steven J. and Jackson, Barry and Miller, Brek A. Date : 07 July 2005 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Peltier repairs at Narrabri in 2018 FebruaryThe Peltier thermoelectric modules were replaced in the starboard scattering detector. The port detector modules were tested and confirmed operational. The water-coolant pump was found to have failed. A position encoder failed during the site visit, and temporary repairs were completed allowing norm... [ more ] The Peltier thermoelectric modules were replaced in the starboard scattering detector. The port detector modules were tested and confirmed operational. The water-coolant pump was found to have failed. A position encoder failed during the site visit, and temporary repairs were completed allowing normal operation. Replacements for both the pump and encoder will be sent from Birmingham. | Author : Hale, Steven J. Date : 19 February 2018 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Progress report on the construction of the South African dome -- 1989 November/December | Author : Davidson, Colin and Williams, Hugh K. Date : 25 March 2004 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| RED v1.7 -- variable CadenceNew versions of RED and ORANGE are ready. They now allow an optional CADENCE keyword in the control file. | Author : Hale, Steven J. and Miller, Brek A. Date : 19 March 2004 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Repairs to Jabba at Carnarvon in 2016 AugustA major leak on the water-cooling loop inside the spectrometer caused serious damage to the printed circuit boards inside the rear connections box. The dome azimuth drive had problems with a damaged gearbox output shaft. Peltiers failed in two detectors. The linear polariser failed resulting in almo... [ more ] A major leak on the water-cooling loop inside the spectrometer caused serious damage to the printed circuit boards inside the rear connections box. The dome azimuth drive had problems with a damaged gearbox output shaft. Peltiers failed in two detectors. The linear polariser failed resulting in almost zero ratio. Repairs were completed sufficiently to get the site back online and operational, but significant work is still required. The water-cooling loop can not be reactivated without major repairs to the spectrometer chassis. The data now show a strong low-frequency footprint caused by the use of a lens from a pair of polarising sun-glasses as a substitute polarising filter. A CCD-based guider monitor was used to assess the guiding performance of the mount. | Author : Hale, Steven J. Date : 09 September 2016 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Repairs to Jabba at Carnarvon in 2016 MarchThe signal to noise performance of spectrometer-J (Jabba) has been deteriorating since it was installed in 2009 July. The fault was identified as being a failed Schott KG4 short-pass infra-red filter. Since KG4 has been discontinued and no spares are available, it was decided to simply remove the fi... [ more ] The signal to noise performance of spectrometer-J (Jabba) has been deteriorating since it was installed in 2009 July. The fault was identified as being a failed Schott KG4 short-pass infra-red filter. Since KG4 has been discontinued and no spares are available, it was decided to simply remove the filter and run with only the Schott RG9 coarse red pre-filter installed. Additional work identified a failed rain detector which was removed and returned to Birmingham, with a replacement to be shipped out as soon as possible. The batteries in the UPS were also replaced. | Author : Hale, Steven J. Date : 31 March 2016 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Replacement of counters, temperature monitor, and peltiers in Carnarvon in 2013 SeptemberThe counters were replaced with a new unit, and the temperature monitor was upgraded from an old 10-bit system to a new 24-bit version. The Peltiers in the aft detectors were replaced. | Author : Hale, Steven J. Date : 30 September 2013 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Schematics for the 60-foot/150-foot tower auto-guider at Mount Wilson ObservatoryElectrical schematics for the 60-foot/150-foot tower auto-guider at Mount Wilson Observatory. | Author : Hale, Steven J. Date : 30 May 2016 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Shutter problems in Carnarvon in 2015 FebruaryThe shutter motor keeps tripping out, and causing the dome to become stuck open. The dome and shutter motors were swapped over to eliminate a fault with the motor. It was discovered that there was no keyway on the shutter motor shaft which was allowing the motor to slip. A second fault was found on ... [ more ] The shutter motor keeps tripping out, and causing the dome to become stuck open. The dome and shutter motors were swapped over to eliminate a fault with the motor. It was discovered that there was no keyway on the shutter motor shaft which was allowing the motor to slip. A second fault was found on one of the SSR relays in the relay box. A keyway was installed, and the faulty SSR bridged out. The shutter now operates correctly. Additional work was done on the weather arm, replacing the rain detector and repairing the anemometer. | Author : Hale, Steven J. and Jackson, Barry Date : 09 March 2015 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Shutter repairs and updated fibre conversion at Carnarvon in 2019 FebruaryCarnarvon was offline due to a shutter motor failure, and a computer failure. The shutter motor and reduction gearbox was replaced with the spare from the on-site shipping container. A new computer was installed. Further work was completed on the Jabba fibre conversion to resolve some ongoing issues... [ more ] Carnarvon was offline due to a shutter motor failure, and a computer failure. The shutter motor and reduction gearbox was replaced with the spare from the on-site shipping container. A new computer was installed. Further work was completed on the Jabba fibre conversion to resolve some ongoing issues and return the instrument performance and data quality to expected levels. | Author : Hale, Steven J. Date : 27 March 2019 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Summary of autoguider wye cablesWiring diagrams for the autoguider wye cables used on all five mounts are presented. | Author : Hale, Steven J. Date : 10 December 2013 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Sutherland 2011 March port detector peltier repairTemperature control of the port detector had been lost. The Peltiers were replaced. I installed new Dec limit switches, upgraded the computer to Fedora 14, installed a new hard disk, and replaced the CPU fan in the computer. | Author : Hale, Steven J. Date : 03 June 2011 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Sutherland 2012 June installation of tiger countersThe gating on the original counters had failed. Only the first channel (FSTAR) was producing any useful data. On this trip, the counters were removed and replaced with the new \Tiger Counters". Also, a new pan/tilt network camera was installed. | Author : Hale, Steven J. Date : 26 July 2012 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Sutherland health checkA brief look at the current condition of Spectrometer F in Sutherland. | Author : Hale, Steven J. Date : 21 June 2006 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Temperature control repairs in Narrabri in 2015 OctoberThe temperature drive cable was replaced, a new water-loop motor and pump was installed, and an air conditioner was replaced. The current-limit on the mount motors was increased, and the mount gears cleaned and re-lubricated. | Author : Hale, Steven J. Date : 04 December 2015 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Temperature controller repairs in Mount Wilson in 2009 JulyThe temperature controllers in Mount Wilson were repaired. | Author : Hale, Steven J. Date : 29 September 2009 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The BiSON CD-ROM data storeThe organization of the BiSON CD ROM Data Store is described. The procedures for adding data to the maintaining the Complete Dat Archive are prescribed. | Author : Allison, John and Chaplin, William J. and Elsworth, Yvonne and Hale, Steven J. and Miller, Brek A. Date : 11 May 2004 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The Hannibal temperature controllersA temperature controller for Hannibal in Las Campanas. | Author : Hale, Steven J. Date : 08 May 2015 Source : Technical Report. Birmingham Solar Oscillations Network. Collection : BiSON Technical Report Series | |
| The Narrabri temperature controllerSome technical information on the Narrabri Temperature Controller is presented. | Author : Barnes, Ian Date : 09 November 2010 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The Sutherland temperature controllersSome technical information on the configuration of the Sutherland Temperature Con-trollers is presented. | Author : Barnes, Ian Date : 29 January 2009 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The construction of the Narrabri dome -- 1992 August | Author : Williams, Hugh K. Date : 25 March 2004 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The grand opening of the Las Campanas ZooThe zoo software is installed in Las Campanas on a new computer. The instruments are cleaned, the alignment checked, and all other electronics re-calibrated. | Author : Hale, Steven J. and Miller, Brek A. Date : 01 February 2006 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The grand opening of the Mount Wilson ZooThe zoo software is installed in Mount Wilson on a new computer. The front cell is changed because all of the potassium had leaked out. One of the forward detectors was replaced because it was noisy. | Author : Miller, Brek A. Date : 14 September 2005 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The grand opening of the Narrabri Zoo in 2004 JulyThe zoo system is installed in Narrabri. The relay box is rewired so that it can handle the new blind motor. | Author : Jackson, Barry and Miller, Brek A. Date : 02 November 2004 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The grand opening of the Sutherland ZooThe zoon software is instaleed in Sutherland on a new computer. | Author : Barnes, Ian and Miller, Brek A. Date : 16 October 2006 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The installation of Klaus at Mount Wilson in 1996 JuneRoger New visited Mount Wilson from 1996 April 2 to April 14 and fixed a problem with the cell that began on 1996 January 8. Roger returned to Mount Wilson with Brek Miller on 1996 July 17 to install Klaus, the newest two-magnet spectrometer. | Author : Miller, Brek A. and New, Roger Date : 14 May 1999 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The installation of a digital autoguider and tiger counters in Narrabri in 2013 AprilA digital autoguider (the \mount controller") was installed. New \Tiger" counters replaced the existing, broken, scaler system. | Author : Hale, Steven J. and Davies, Guy R. Date : 20 May 2013 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The installation of a digital autoguider in Carnarvon in 2011 SeptemberWe upgraded the autoguider and mount control system on this visit. We installed a digital autoguider: the mount controller. | Author : Hale, Steven J. and Miller, Brek A. Date : 06 January 2012 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The installation of a digital autoguider in Las Campanas in 2011 MarchI upgraded the autoguider and mount control system on this visit. I installed our first digital autoguider: the mount controller. I installed a new UPS, cured the step in Ivan, installed a new waterproof cloud detector, cleaned the rain detector, replaced the cups on the anemometer, and replaced the... [ more ] I upgraded the autoguider and mount control system on this visit. I installed our first digital autoguider: the mount controller. I installed a new UPS, cured the step in Ivan, installed a new waterproof cloud detector, cleaned the rain detector, replaced the cups on the anemometer, and replaced the CPU fan in the computer. | Author : Miller, Brek A. Date : 26 May 2011 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The installation of a digital autoguider in Sutherland in 2013 NovemberA digital autoguider (the "mount controller") was installed. | Author : Hale, Steven J. Date : 10 December 2013 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The installation of a new transmission monitor in Izana in 2004 NovemberThe transmission-monitor photomultiplier tube is replaced by a new transmission monitor based on a photodiode. A temperature monitor is installed. It monitors the temperatures of the outside air, the upstairs room, the spectrometer baseplate, the interference filter, the scattered-light photomultipl... [ more ] The transmission-monitor photomultiplier tube is replaced by a new transmission monitor based on a photodiode. A temperature monitor is installed. It monitors the temperatures of the outside air, the upstairs room, the spectrometer baseplate, the interference filter, the scattered-light photomultiplier tube, and the cell oven. It also monitors the right-ascension and declination guider error signals. A new BeebSub is installed. | Author : Hale, Steven J. and Miller, Brek A. Date : 26 January 2005 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The installation of new temperature controllers at Narrabri in 2010 FebruaryDetails of the trip to Narrabri in 2010 February are presented. | Author : Barnes, Ian and Hale, Steven J. Date : 09 November 2010 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The installation of the Sutherland temperature controllers in 2007 AugustDetails of the trip to Sutherland to install new temperature controllers and replace the damaged water tank are presented. | Author : Barnes, Ian Date : 15 January 2008 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The mount controllera digital autoguider for Las Campanas | Author : Barnes, Ian and Miller, Brek A. Date : 26 May 2011 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The removal of Jabba from Carnarvon in 2006 NovemberIan Barnes, Brek Miller, and Barry Jackson visited Carnarvon late in 2006. Jabba was removed from the mount, the weather cabling was replaced, all the dome roolers were replaced, the cloud detector LDR was replaced, some mount limit switches were replaced, the computer was replaced, the temperature ... [ more ] Ian Barnes, Brek Miller, and Barry Jackson visited Carnarvon late in 2006. Jabba was removed from the mount, the weather cabling was replaced, all the dome roolers were replaced, the cloud detector LDR was replaced, some mount limit switches were replaced, the computer was replaced, the temperature onitor was reconfigured to monitor different things, the PMTEB was replaced, and the autoguider was realigned. | Author : Barnes, Ian and Miller, Brek A. and Jackson, Barry Date : 01 February 2007 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The replacement of the blind motor and the connection of the station to the internet in Narrabri in 2000 MarchI visited Narrabri from 2000 March 17 to March 22. I replaced the blind motor and connected the station to the Internet. I looked at the V/F problem, but was not able to fix it. | Author : Miller, Brek A. Date : 14 August 2000 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The replacement of the shaft couplers in Las Campanas in 2008 MarchAll shaft couplers were replaced. The front filter mounts on both instruments were replaced and the alignment checked. | Author : Hale, Steven J. Date : 23 April 2008 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| The trip to Las Campanas during the big snowstorm of 1997 AugustI had to make many repairs to the electronics, the damage looks like it was caused by a lightning strike. Work was hampered at first by high winds, and then by heavy snowfall. A small group of people were trapped on the mountain: The roads were out, the phone lines down, the electricity ... [ more ] I had to make many repairs to the electronics, the damage looks like it was caused by a lightning strike. Work was hampered at first by high winds, and then by heavy snowfall. A small group of people were trapped on the mountain: The roads were out, the phone lines down, the electricity supply cut, and the Internet connection was not working. But through it all, not one single volcano erupted. | Author : Miller, Brek A. Date : 12 November 1997 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Update on my report on the trip to Mount Wilson (Hale) Observatory | Author : Elsworth, Yvonne Date : 17 August 1992 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
| Work carried out at Narrabri in 2003 JulyThe main aims of this trip were to install the latest version of the Automatic Gain Control (AGC) circuit to try to improve the Narrabri Autoguider, to reconfigure the blind motor system and to install a "magnetic" Pockels cell. In the end, the latter was thwarted by an unexpected fault in the "velo... [ more ] The main aims of this trip were to install the latest version of the Automatic Gain Control (AGC) circuit to try to improve the Narrabri Autoguider, to reconfigure the blind motor system and to install a "magnetic" Pockels cell. In the end, the latter was thwarted by an unexpected fault in the "velocity" Pockels cell driver. A few maintenance tasks were also achieved. | Author : New, Roger and Isaak, George R. Date : 08 October 2003 Source : Technical Report. Birmingham Solar Oscillations Network. Keywords : Helioseismology, Observations; Oscillations, Solar Collection : BiSON Technical Report Series | |
|