Barnes, Ian and Miller, Brek A. and Jackson, Barry (2007) The removal of Jabba from Carnarvon in 2006 November. Technical Report. Birmingham Solar Oscillations Network.
| PDF (LaTeX) - Published Version bison282.pdf 238Kb |
Abstract
Ian Barnes, Brek Miller, and Barry Jackson visited Carnarvon late in 2006. Jabba was removed from the mount, the weather cabling was replaced, all the dome roolers were replaced, the cloud detector LDR was replaced, some mount limit switches were replaced, the computer was replaced, the temperature onitor was reconfigured to monitor different things, the PMTEB was replaced, and the autoguider was realigned.
Type of Work: | Monograph (Technical Report) | ||||
---|---|---|---|---|---|
School/Faculty: | Schools (1998 to 2008) > School of Physics & Astronomy | ||||
Number of Pages: | 21 | ||||
Department: | High-Resolution Optical Spectroscopy | ||||
Date: | 01 February 2007 | ||||
Projects: | BiSON - Birmingham Solar Oscillations Network | ||||
Series/Collection Name: | BiSON Technical Report Series | ||||
Keywords: | Helioseismology, Observations; Oscillations, Solar | ||||
Subjects: | Q Science > QB Astronomy Q Science > QC Physics | ||||
Related URLs: |
| ||||
ID Code: | 2034 |
|
Repository Staff Only: item control page